Retainer Calculator

Global tools

A retainer is a steady monthly block of your time, sold at a discount because the client commits to it. Done well it is reliable income; done too cheap it is a block of your calendar earning below your floor.

Guaranteed hours you set aside for this client every month.

$

The rate you would charge that client for on-demand hourly work.

The price cut for committing to the block. 10%-20% is a common range.

Results update as you type. Nothing leaves your device.

Currency symbol

Symbol only - nothing is converted and no exchange rate is used. Figures quoted in the explanation text stay as the sources publish them.

Monthly retainer

$5,100

40 hours × $150.00 at 15% off

Effective hourly
$127.50
Discounted by
$900

The numbers behind the retainer

LineValue
Hours a month40
Hourly rate$150.00
Full value of hours$6,000
Retainer discount15%
Discount amount-$900
Monthly retainer$5,100
Effective hourly rate$127.50

The discount buys predictability, which has real value - a guaranteed block is easier to schedule around than rain-checking hourly work. The trap is a discount so deep the retainer earns less than your floor wage.

A 40-hour retainer at $150.00 with a 15% discount lands at $5,100 a month - an effective $127.50 an hour. That is 2 retainers short of a $10,000 monthly target, before the projects and one-off work that retainer clients always add.

This calculator shows the sticker value of the hours, the discounted retainer, and the effective hourly rate hiding inside it, so the price protects both your cash flow and your earning rate.

About this retainer calculator

Retainers trade a discount on the headline rate for a guaranteed block of your time, because the client is buying predictability rather than hours. This page shows the full value of those hours, the monthly figure after the discount, and the effective hourly rate hiding inside, so a cheap block never passes unnoticed.

The construction is standard services practice - hours times rate for the full value, then a discount, usually 10% to 20%, for the commitment. The effective rate is the guardrail against cutting too deep, and every figure is computed locally, so nothing about your clients or your rate leaves the device.

It cannot decide whether the discount is worth it: overage billing, scope creep and month-to-month break clauses all sit outside the monthly sum. Read the effective rate as a floor to protect, and remember the built-in ten-thousand-dollar goal is an example target, not advice about what anyone should earn.

How this retainer calculator works

Hours times rate, minus a discount

A retainer begins as the full value of the reserved hours: 40 hours a month at $150 is $6,000. The retainer discount is then taken off that figure rather than added to it, so a 15% discount produces a $5,100 monthly retainer, and the discount amount is printed on its own line so the cost of the commitment is never hidden inside the total.

The discount is what the client gets for committing to the block in advance. That commitment has value on your side too - a guaranteed block can be scheduled and staffed, where hourly work cannot - which is why the page treats the discount as a trade with a price rather than as a courtesy.

The effective rate is the honest test

Divide the discounted retainer by the hours and you get the effective hourly rate, which at the defaults is $127.50. That is the number to hold against your floor, not the $150 you charge for on-demand work, because the discount is real money and it is given before a single hour is worked.

The effective rate is the guardrail on the whole arrangement. A retainer that lands below the rate you would accept for ordinary hourly work is a discount you did not intend to give, and it ties up the hours at the same time. Reading it next to the discount percentage is what stops a reasonable-looking percentage from becoming an unreasonable monthly fee.

Retainers anchor your base income

Retainers supply the predictable part of a freelance or agency month, and retained clients tend to add one-off project work on top, so the monthly baseline is rarely the whole relationship. That is why a retainer can be priced lower per hour than project work without being a loss.

The trade-off is capacity: an hour promised to a retainer cannot be sold to anyone else, so the effective rate has to clear the work you would otherwise take. The page shows the hours, the discount and the effective rate together for exactly that comparison.

Retainers versus the monthly target

The page measures against a built-in $10,000 monthly example goal, so the count it prints is how many retainers of exactly the size on screen it would take to reach that figure. It is a fixed reference point, not advice about what anyone should earn, and it knows nothing about your expenses.

Changing the hours, the rate or the discount moves the retainer and the count together, which is the useful part: a larger retainer usually beats another client, because every client arrives with its own scope, meetings and scheduling. A small retainer therefore reads as many clients, and a large one as very few.

The capacity a retainer really consumes

Forty hours a month is a quarter of a 160-hour working month, not a small block. Three retainers that size fill 75% of the calendar before a single project arrives, and the fourth one is the month - which is why retainers belong in a capacity plan before they belong in a revenue plan.

The discount is paid in hours, not in goodwill. At $150 an hour a 15% cut is $22.50, so a 40-hour retainer gives away six hours of work every month: 72 hours a year, close to two working weeks. Moving from 15% to 10% buys 24 hours back a year at the same sticker rate.

Decide what happens to unused hours before the first invoice. They can expire (good for you, corrosive for trust), roll over one month with a cap, or convert into a project credit. Rolling over without a cap turns the guaranteed block into a savings account the client draws down in their busiest quarter - and their busiest quarter is usually yours.

Raising the floor beats deepening the discount. A 40-hour retainer at a $127.50 effective rate earns less than 25 hours at $150 with the other 15 sold elsewhere at full price; the retainer only wins where those hours would otherwise sit empty. When the calendar is full, a discount is a gift.

Watch the invoice, not the proposal: the discount is a percentage of the sticker rate, so if the sticker rate was already a compromise, the retainer compounds it. Re-run the figure at every renewal - a rate that was fine eighteen months ago is a discount today.

One last comparison worth doing before signing: the same hours sold as a project. Forty hours at the effective retainer rate against forty hours at the project rate, minus the proposal and admin time a project costs, is the honest test of whether the guaranteed block is being paid for or paid for twice.

Worked examples

Each example below was run through the calculator on this page when the site was built, so the numbers match what you see when you enter the same inputs.

40 hours at $150, 15% off

Hours a month: 40 · Your hourly rate: $150.00 · Retainer discount: 15%

Monthly retainer

$5,100

40 hours × $150.00 at 15% off

Effective hourly: $127.50 · Discounted by: $900

A $5,100 monthly retainer - an effective $127.50 an hour, the default case.

A lean weekly block

Hours a month: 20 · Your hourly rate: $100.00 · Retainer discount: 10%

Monthly retainer

$1,800

20 hours × $100.00 at 10% off

Effective hourly: $90.00 · Discounted by: $200

An $1,800 retainer at $90 an hour effective - a light commitment that still clears the floor.

A deep discount that erodes the rate

Hours a month: 40 · Your hourly rate: $150.00 · Retainer discount: 40%

Monthly retainer

$3,600

40 hours × $150.00 at 40% off

Effective hourly: $90.00 · Discounted by: $2,400

40% off drags the effective rate down to $90 an hour - worth checking before signing.

Sixty hours a month at a lower rate

Hours a month: 60 · Your hourly rate: $120.00 · Retainer discount: 10%

Monthly retainer

$6,480

60 hours × $120.00 at 10% off

Effective hourly: $108.00 · Discounted by: $720

A 60-hour block at $120, 10% off, is a $6,480 retainer at an effective $108 an hour - two of these cover the built-in $10,000 monthly goal.

Frequently asked questions

How do I set a retainer price?

Multiply the guaranteed hours by your hourly rate for the full value, then apply a discount for the commitment, usually 10%-20%. The result is your monthly retainer.

What is a fair retainer discount?

Between about 10% and 20% is typical. The point of the discount is buy predictability, not to make the work cheap - if the effective hourly rate drops below your floor, the discount is too deep.

Should a retainer be cheaper than hourly?

Usually, because the client guarantees the work and you can plan around it. But the discount should still leave your effective rate above what you need to earn to take the block.

How many retainers make a full income?

The calculator measures against a built-in $10,000 monthly example goal, so the count it shows is how many retainers of the size you entered would replace that specific target. Put a real client's hours, rate and discount in and the number updates, but the faster lever is usually raising the retainer size rather than adding more clients.

What if the client uses more hours than the retainer covers?

Agree the overage rate in the contract before it happens, typically your full hourly rate for anything past the reserved block. A retainer is a floor on the hours, not a ceiling - billing the overage at your regular rate is how the block stays profitable.

Assumptions and sources

  • Hours times rate minus discount is the standard monthly retainer construction.
  • A 10%-20% retainer discount reflects common freelance practice, and the effective-rate guardrail is the page's own protection; capped-hours overage, scope creep and break clauses are not modelled.
  • It runs in your browser and nothing you type is uploaded.

Last reviewed 2026-09-24. Business arithmetic — not accounting, tax or legal advice. Read the full disclaimer.

Where a figure on this page comes from an official agency — HUD, IRS, FICO or a state body — the site keeps a dated snapshot of the source page in its sources library, and a scheduled job re-checks that snapshot, so the number can be traced back to the document it came from.