The reorder point is the shelf level that should trigger a new order: the units that will sell while the next shipment is on its way, plus a buffer of safety stock for the shipment that arrives late or the day that sells fast.

Your average daily sales of this item - ideally from the last few weeks, not a yearly average that hides seasonal swings.

From placing the order with your supplier to the stock being sellable: manufacture, shipping and receiving.

The buffer that covers a late shipment or a demand spike: the more you hold, the safer - and the more it costs to hold.

Results update as you type. Nothing leaves your device.

Reorder point

680

560 units used during the 14-day lead time, plus 120 units of buffer.

Lead-time demand
560
Safety stock
120
Lead time (days)
14

What the reorder point is made of

LineValue
Units sold per day40
Lead time (days)14
Lead-time demand560
Safety stock120
Reorder point680

The lead-time demand is the stock that will sell while the next order is on its way; the reorder point is that, plus the buffer you refuse to dip below.

How to use the number

  • Place the order the moment on-hand stock crosses down through the reorder point - before it reaches zero, because the new order has not arrived yet.
  • If you review stock on a schedule rather than continuously, check against the reorder point plus what you expect to sell before the next review.
  • The safety stock is a hold-my-place in the num: raise it after a stockout, trim it when the holding cost of the surplus outweighs the risk it protects against.
The defaults - 40 units a day, a 14-day lead time and 120 units of buffer - restock at 680, which covers 560 units of lead-time demand plus the buffer.

Order above it and you pay to hold stock you did not need yet; order below it and the shelf runs empty before the new stock lands. The page adds the two numbers and names the level where both mistakes stop.

About this reorder point calculator

Stock has to be reordered before it runs out, and the page finds the level that should trigger the next order from lead-time demand and the safety stock you choose. It pairs with the holding-cost page: that one prices the stock, this one decides how low to let it get.

It is not a reorder-quantity tool, and it does not model demand variability statistically. It adds the two numbers that make a reorder point and leaves the quantity and the exact buffer math to inputs you set.

How this reorder point calculator works

Lead-time demand is the stock that sells while you wait

Your daily sales multiplied by the lead time - from placing the order to the goods being sellable - is what will leave the shelf before the new stock arrives. At 40 units a day and a 14-day lead time, that is 560 units, and the page prints the figure as its own line between the two inputs and the reorder point so the multiplication can be checked without repeating it.

Daily demand sets the scale of everything after it. Enter units, not dollars: the reorder point is a shelf count, so it has to be expressed in the same unit your stock count uses. A figure drawn from the last few weeks tracks a real selling rate far better than a yearly average that flattens a seasonal peak into a number nobody actually sells at.

Lead time is just as easy to understate. It runs from the moment the order is placed to the moment the goods can be sold, so manufacture or packing, transit, customs and receiving all belong inside it. A lead time that forgets customs produces a reorder point that is too low in every single cycle.

Safety stock is the buffer on top

Lead-time demand assumes two things hold at once: that your forecast is right and that the supplier is on time. Safety stock covers the days when neither does - a late shipment, a demand spike, a picking error, a carrier that loses a carton. It is the only part of the reorder point that exists to absorb a surprise rather than to serve ordinary selling.

The buffer is an input, never a recommendation, and the page is explicit about that. Raise it after a stockout has actually cost you sales, and trim it when the holding cost of the surplus outweighs the risk it protects against. Two sellers with the same demand and the same supplier can reasonably choose different buffers and both be right.

More buffer is safer and costs more to carry, which is why the trade belongs to you. The page charges the buffer nothing and prices it nowhere; it adds whatever you enter to the lead-time demand and lets the total move with it.

The reorder point is the sum

Add the two figures and the result is the shelf level at which the next order should go out: 560 units of lead-time demand plus 120 units of buffer restock at 680. Crossing down through that line is the trigger - the page does not wait for zero, because the new order has not arrived yet and would leave a full lead time with nothing to sell.

The table prints the chain in order - daily units, lead time, lead-time demand, safety stock and the reorder point - so changing an input moves the whole route instead of producing an answer disconnected from the numbers that built it. The downloadable breakdown carries the same five lines for a spreadsheet.

What the figure does not answer is quantity. It says when to order, not how much you order: the order size is a separate decision about ordering cost against holding cost, and this page deliberately stays on the when side of it.

The rule flexes with how you review

The number is a trigger, and your rhythm of stock checks decides how much lead you build in. A shop that watches stock continuously can act on the reorder point directly. A shop that counts once a week should review against the reorder point plus what it expects to sell before that next count, because the shelf keeps selling through the gap.

There is no universal reorder point behind the page, only arithmetic on the three figures you supply. A 45-day ocean lead time at 25 units a day triggers at 1,275 units with a 150-unit buffer, while a local supplier on a four-day lead time at 60 units a day triggers at 320 - the same formula, two very different shelves.

The defaults are a worked case rather than a benchmark: 40 units a day, a 14-day lead time and a 120-unit buffer land on 680. A daily demand of zero stops the page instead of returning a trigger, because there is no selling rate to plan against, and a reorder point calculated for one product should never be carried over to another.

The average is not the risk: safety stock from variance

The buffer is the one number on this page with no formula behind it, and the honest way to size it is from variability, not from a rule of thumb. If the item sells 40 a day on average but the daily figure has a standard deviation of 6, a 14-day lead time needs about 1.65 × 6 × √14 ≈ 37 units of safety stock to hold a 95% service level - a quarter of the 120 the page defaults to.

Order size changes the picture too. If the supplier ships 400 at a time, average cycle stock is 200 units on top of the buffer, so on-hand at the moment you order is nearer 880 than 680. That extra stock is real money: at $4 a unit it is $800 tied up in the shelf, which is what the holding-cost page prices.

Reviewing stock weekly rather than continuously adds the demand you will sell between reviews - seven days at 40 a day is another 280 units. Reorder at 680 plus 280 and the order lands while the buffer is still intact; reorder at 680 alone and the review cycle eats the buffer before anyone notices.

The last constraint is the supplier minimum. If the minimum order is 1,000 units and the lead time sells 560, a single order covers about 25 days of demand - less than a month, which usually means the reorder point is the least of your problems: order quantity has become the inventory decision.

Worked examples

Each example below was run through the calculator on this page when the site was built, so the numbers match what you see when you enter the same inputs.

The default rhythm

Units sold per day: 40 · Lead time in days: 14 · Safety stock in units: 120

Reorder point

680

560 units used during the 14-day lead time, plus 120 units of buffer.

Lead-time demand: 560 · Safety stock: 120 · Lead time (days): 14

560 units of lead-time demand plus 120 of buffer restocks at 680.

A long ocean lead time

Units sold per day: 25 · Lead time in days: 45 · Safety stock in units: 150

Reorder point

1,275

1,125 units used during the 45-day lead time, plus 150 units of buffer.

Lead-time demand: 1,125 · Safety stock: 150 · Lead time (days): 45

A 45-day lead time burns 1,125 units before the shipment lands - restock at 1,275 with the buffer.

A short local lead time

Units sold per day: 60 · Lead time in days: 4 · Safety stock in units: 80

Reorder point

320

240 units used during the 4-day lead time, plus 80 units of buffer.

Lead-time demand: 240 · Safety stock: 80 · Lead time (days): 4

Four days at 60 units a day is 240 of lead-time demand; with 80 of buffer the trigger is 320.

No buffer yet - the bare minimum

Units sold per day: 40 · Lead time in days: 14 · Safety stock in units: 0

Reorder point

560

560 units used during the 14-day lead time, plus 0 units of buffer.

Lead-time demand: 560 · Safety stock: 0 · Lead time (days): 14

Without any safety stock the reorder point is the lead-time demand alone: 560, which rests entirely on the forecast and the supplier being right.

Frequently asked questions

What is the difference between reorder point and reorder quantity?

The reorder point is the level that triggers the order - when. The reorder quantity is how much you order - how much. This page finds the when; the how much is a separate decision about order cost versus holding cost, which the holding-cost sibling helps price.

How much safety stock should I keep?

Enough to survive the worst realistic delay or demand spike, weighed against the holding cost of the surplus. The page makes the buffer an input rather than guessing: raise it after a stockout, trim it when the stock it holds costs more than the risk it protects against.

What does "lead time" include?

Everything between placing the order and the stock being sellable - supplier manufacture or packing, shipping, customs and receiving into your warehouse. A lead time that forgets customs is a forecast that quietly understates the reorder point.

Why would I reorder above zero instead of just-in-time?

Because the new order has not arrived when you place it - it arrives a lead time later. Ordering exactly when stock hits zero guarantees a gap of one lead time with nothing to sell. The reorder point builds that lead-time demand in on purpose.

Does this work for every product?

It suits products with a steady-enough demand and a real lead time. For one-off or made-to-order items the concept still applies but the demand estimate matters more; the page says the daily figure should come from recent weeks, not a yearly average that hides swings.

Assumptions and sources

  • The reorder point is lead-time demand plus safety stock, standard inventory management.
  • Lead-time demand is daily sales × lead time, and safety stock is weighed against holding cost, so a stockout is priced against carrying more.
  • It runs in your browser and nothing you type is uploaded.